Euro Tech Group — to bezwykopowa przebudowa rurociągów z użyciem wykładziny polimerowej

TECHNOLOGY

  • Insertion of a sliding film to simplify the installation of the cable prior to installation

  • Installation of packer at the liner beginning
  • laying the liner using a winch
  • Installation of packer at the liner end
  • Installation of a connecting liners and a special measuring probes between the packers and the steam / UV unit
  • Liner calibration using compressed air for optimal adaptation to the existing surface of the pipeline walls

  • curing according to the installation instructions

  • after curing: removal of the packers at the ends of the liners from the wells

  • inner film removal

  • if necessary: check the tightness of the refurbished pipe

  • opening of the side inlets, allowing quick re-commissioning of the line and sewer system

MATERIAL

50 lat

to termin bezawaryjnej pracy zdezynfekowanej rury

4-5 godzin

jest czas montażu wykładziny na budowie

150 m / dzień

to duża prędkość układania wykładziny

Ochrona

nawierzchni drogowych, terenów zagospodarowanych, krajobrazu naturalnego

CONTACTS

Euro Tech Group Sp.z o.o 
NIP 8133822567,
REGON 384306744,
KRS 0000802659
UL. NORBERTA BARLICKIEGO 14 /16
СZECHOWICE-DZIEDZICE, 43-502
POLAND
E: groupeurotech@gmail.com

© 2021 Euro Tech Group